Planning ยป Application Details
Application Reference Number 2017/1396
Description Discharge of conditions 3, 4, 6, 7, 8, 11, 12, 13 and 15 of previously approved 2016/0474 - Variation of condition 2 of app 2013/0542 (Residential development of 25 dwellings) to allow changes to layout, boundary treatment and erection of a new sub station.
Site Address Land off Hill End Road, Mapplewell, Barnsley, S75 6DU
Received Date 17 October 2017
Valid From 17 October 2017
Decision Approve
Status Final Decision
Applicant Name Mr Hughes
Applicant Address 17B Astley Way Industrial Estate Swillington Leeds LS26 8XT
Parish None
Ward Darton East Ward
Application Type Discharge of Conditions
Determination Level Delegated
Agent Name Nicol Thomas
Case Officer Name Hannah Andrew
Case Officer Telephone 01226 772595
Case Officer Email developmentmanagement@barnsley.gov.uk
Environmental Assessment Required No
Received Date 17 October 2017
Valid From 17 October 2017
Consultation Expiry Date 22 November 2017
Target Decision Date 12 December 2017
Extended Target Decision Date 2 March 2018
Decision Date Not yet determined
There are no neighbours associated with this application.
Company Name Address
Contaminated Land Westgate Plaza One, Westgate, Barnsley, S70 2DR
Forestry Officer Level 1 Westgate Plaza One PO Box 604 Barnsley S70 9FE
Highway Drainage Westgate Plaza 1 PO Box 601 Barnsley S70 9FA
Highways DC Highways and Engineering Level 2 Westgate Plaza 1 PO Box 604 Barnsley S70 9FE
Yorkshire Water Services Limited Land Use Planning Western Way Halifax Road BRADFORD BD6 2LZ
Please note these documents are for viewing only. Attempting to save a copy or copies may infringe on copyright laws.
Amended Documentation
00.15021 101 P7 Proposed Drainage Layout.pdf ( 1.66 MB )
00.15021 102 P5 Typical Drainage Details - Sheet 1 of 2.pdf ( 0.29 MB )
00.15021 103 P3 Typical Drainage Details - Sheet 2 of 2.pdf ( 0.33 MB )
00.15021 113P5 Manhole Base Plan and Sections.pdf ( 0.25 MB )
00.15021 130 P5 Manhole Schedule.pdf ( 0.26 MB )
00.15021 134 P2 Kerbing and surfacing plan.pdf ( 1 MB )
00.15021 141 P4 Section 38 Layout.pdf ( 1.71 MB )
00.15021 142 P4 Proposed S38 Details Sheet 1 of 2.pdf ( 0.56 MB )
00.15021 143 P1 Proposed S38 Details Sheet 2 of 2.pdf ( 0.53 MB )
00.15021 145 P5 Highway Long Sections.pdf ( 0.49 MB )
00.15021 190 P6 Proposed Levels.pdf ( 3.51 MB )
00.15021 190 P7 Proposed Levels.pdf ( 3.52 MB )
Application form
20171396 ApplicationFormNoPersonalData.pdf ( 1.02 MB )
Plans
20171396 Highway Layout.pdf ( 1.86 MB )
20171396 Highway Long Sections.pdf ( 0.49 MB )
20171396 Impermeable Area Plan.pdf ( 2.53 MB )
20171396 Manhole Schedule.pdf ( 0.26 MB )
20171396 Proposed Drainage Layout.pdf ( 1.28 MB )
20171396 Proposed Levels.pdf ( 3.93 MB )
20171396 S38 Highway Details.pdf ( 0.61 MB )
20171396 Typical Drainage Details.pdf ( 0.27 MB )
Reports
20171396 Supplementary Phase 2 Ground Investigation Report.pdf ( 5.77 MB )
Statement
20171396 Arboricultural Method Statement.PDF ( 3.8 MB )
20171396 Construction Method Statement and Logistics Plan.pdf ( 0.69 MB )
Supporting Documentation
20171396 Foul Water Drainage Calculations.pdf ( 0.14 MB )
20171396 Mapplewell Dilapidation Survey 2017 01 26.pdf ( 0.19 MB )
20171396 Surface Water Drainage Calculations.pdf ( 0.19 MB )