| Description |
Discharge condition 7 (Construction Management) of 2017/1315 -The retention of the natural gas meter cabinet, the installation of a containerised back-up power generator, cooling radiator, associated pipework and transformer outside of the existing generation building and a 5m high acoustic screen, also existing generator stack heights increased by 3m. |