Planning ยป Application Details
Application Reference Number 2021/0499
Description Discharge of conditions of 7 (foul and surface water drainage), 8 (hard and soft landscaping), 14 ( highway improvement works) and 17 (highway engineering construction details) 2018/0279 - Erection of permanent structures and associated public realm works (Partial discharge relating to Cheapside, May Day Green and Queen Street only)
Site Address Land a Cheapside, May Day Green, Queen Street, Barnsley
Received Date 6 April 2021
Valid From 6 April 2021
Decision Under Consideration
Status Registered
Applicant Name Mr Andrew Lunn
Applicant Address c/o Agent
Parish None
Ward Central Ward
Application Type Discharge of Conditions
Determination Level Under Consideration
Agent Name Avison Young
Case Officer Name Stacey White
Case Officer Telephone 01226 772595
Case Officer Email developmentmanagement@barnsley.gov.uk
Environmental Assessment Required No
Received Date 6 April 2021
Valid From 6 April 2021
Consultation Expiry Date Not yet determined
Target Decision Date 1 June 2021
Extended Target Decision Date Not yet determined
Decision Date Not yet determined
There are no neighbours associated with this application.
There are no consultees involved in this application.
Please note these documents are for viewing only. Attempting to save a copy or copies may infringe on copyright laws.
Amended Documentation
20210499 - 0500 - 0501 - C14 - BGW2-ACE-XX-ZZ-DR-C-G700-0134-Access Road White Lining Details.pdf ( 0.54 MB )
20210499 - 0500 - 0501 - C14 - Lambra Road Highway Boundary and New Adoption Rev1.pdf ( 0.57 MB )
20210499 - 0500 - 0501 - C14 - Main Sqaure Highway Boundary and Stopping up Rev1.pdf ( 0.75 MB )
Application form
20210499 ApplicationFormRedacted.pdf ( 1.55 MB )
Plans
20210499 [2018-0279] - Planning Phasing Plan + Application Site Plan (Rev.1).pdf ( 1.57 MB )
20210499 Existing Site Plan - Whole Site.pdf ( 3.77 MB )
20210499 General Arrangement Plan - Phase 1 Construction Plan.pdf ( 1.34 MB )
20210499 General Arrangement Plan - Phase 2.pdf ( 0.72 MB )
20210499 General arrangement plan - Phase 3.pdf ( 1.79 MB )
20210499 Levels Plan - Cheapside Alhambra.pdf ( 1.09 MB )
20210499 Levels plans - Cheapside and Queen Street.pdf ( 0.44 MB )
20210499 Lighting strategy plan.pdf ( 0.43 MB )
20210499 Master Landscape Specification.pdf ( 0.48 MB )
20210499 Peel Square - General Arrangement Plan.pdf ( 1.44 MB )
20210499 Planning Phasing Plan.pdf ( 2.47 MB )
20210499 Sections A-F.pdf ( 1.13 MB )
20210499 Site Delivery Plan.pdf ( 9.29 MB )
Superseded Documentation
20210499 0500 +0501 Application Location Plan (07-05-2021).pdf ( 0.58 MB )
Supporting Documentation
20210499 Barnsley Tenant Handbook HBC Operational Constraints.pdf ( 1.93 MB )
20210499 Cheapside and Queen Street - General Arrangment Plan.pdf ( 0.82 MB )
20210499 Cheapside Paving sides and swatches.pdf ( 0.94 MB )
20210499 Cheapside retained sitting wall details.pdf ( 0.35 MB )
20210499 Cheapside Retaining Wall Details.pdf ( 0.35 MB )
20210499 Drainage.pdf ( 0.72 MB )
20210499 Final Covering Letter_Redacted.pdf ( 1.09 MB )
20210499 Glassworks Phase 2 - Delivery Instructions.pdf ( 0.14 MB )
20210499 Glassworks Square Paving Pattern and Swatches Sheet 3 of 3.pdf ( 0.64 MB )
20210499 Heald Bollard Options (pdf).pdf ( 3.71 MB )
20210499 Highway Boundary Main Square.pdf ( 4.13 MB )
20210499 Hostile Vehicle Mitigation Measures.pdf ( 0.65 MB )
20210499 HT2-EM Matador 2020.pdf ( 2.91 MB )
20210499 HT2-Mat-EM-4-155-110APS Installation.pdf ( 2.66 MB )
20210499 HT2-Mat-EM-5R-155-110APS Installation.pdf ( 3.54 MB )
20210499 HT3-EM Matador 2020.pdf ( 1.98 MB )
20210499 Installed Matadors.pdf ( 4.63 MB )
20210499 Interchange Square - Hostile Vehicle Mitigation Measures Option 2.pdf ( 1.09 MB )
20210499 Kerb and trim details.pdf ( 0.14 MB )
20210499 Manual Matador 4 .pdf ( 3.04 MB )
20210499 Market Street - Hostile Vehicle Mitigation Measure.pdf ( 0.42 MB )
20210499 May Day Green Paving Pattern and swatches sheet 1 of 3.pdf ( 0.44 MB )
20210499 May Day Green Paving Pattern and Swatches sheet 2 of 3.pdf ( 0.29 MB )
20210499 Pall Mall - Hostile Vehicle Mitigation Measures.pdf ( 0.69 MB )
20210499 Parking Plan.pdf ( 1.09 MB )
20210499 Peel Square - Hostile Vehicle Mitigation Measures.pdf ( 1.53 MB )
20210499 Proposed Drainage.pdf ( 1.51 MB )
20210499 Proposed Levels.pdf ( 1.81 MB )
20210499 Queen Street - additional surafcing details 2.pdf ( 0.46 MB )
20210499 Queen Street - additional surfacing details 3.pdf ( 0.46 MB )
20210499 Queen Street - additional surfacing details.pdf ( 0.46 MB )
20210499 Queen Street - Proposed levels.pdf ( 0.51 MB )
20210499 Queen Street - Street Lighting Ducting.pdf ( 0.53 MB )
20210499 Queen street - Street lighting.pdf ( 0.53 MB )
20210499 Queen Street Paving Patterns and Swatches.pdf ( 0.32 MB )
20210499 Scope of Works .pdf ( 0.24 MB )
20210499 Seat Unit Type Be1 Details - Position 1.pdf ( 0.13 MB )
20210499 Seat Unit Type Be1 Details - Position 2.pdf ( 0.13 MB )
20210499 Seat Unit Type Be1 Details - Position 3.pdf ( 0.2 MB )
20210499 Seat Unit Type Be1 Details - Position 4.pdf ( 0.13 MB )
20210499 Seat Unit Type Be1 Details - Position 5.pdf ( 0.13 MB )
20210499 Seat Unit Type Be1 Details - Position 6.pdf ( 0.2 MB )
20210499 Seat Unit Type Be1 Details - Position 7.pdf ( 0.2 MB )
20210499 Seat Unit Type Be1 Details - Position 9.pdf ( 0.2 MB )
20210499 Seat Unit Type Be1 Details.pdf ( 0.31 MB )
20210499 Town Centre Restrictions - Glassworks.pdf ( 3.47 MB )
20210499 Town Centre Restrictions.pdf ( 0.53 MB )
20210499 Tree pit detail in soft and planting detail.pdf ( 0.26 MB )
20210499 Tree pit details in soft.pdf ( 0.2 MB )
20210499 Typical Handrail Detail.pdf ( 0.35 MB )
20210499 Typical Step Detail.pdf ( 0.85 MB )
20210499 Typical Tree Pit Detail.pdf ( 0.6 MB )