Planning ยป Application Details
Application Reference Number 2021/0501
Description Discharge of conditions of 7 (foul and surface water drainage), 8 (hard and soft landscaping), 14 ( highway improvement works) and 17 (highway engineering construction details) 2018/0279 - Erection of permanent structures and associated public realm works (Partial discharge relating to Interchange, Alhambra and Peel Square only)
Site Address Land at: Cheapside, Eldon Street, Midland Street, Queen Street, Peel Square, Barnsley
Received Date 6 April 2021
Valid From 6 April 2021
Decision Under Consideration
Status Registered
Applicant Name Mr Andrew Lunn
Applicant Address c/o Agent
Parish None
Ward Central Ward
Application Type Discharge of Conditions
Determination Level Under Consideration
Agent Name Avison Young
Case Officer Name Stacey White
Case Officer Telephone 01226 772595
Case Officer Email developmentmanagement@barnsley.gov.uk
Environmental Assessment Required No
Received Date 6 April 2021
Valid From 6 April 2021
Consultation Expiry Date Not yet determined
Target Decision Date 1 June 2021
Extended Target Decision Date Not yet determined
Decision Date Not yet determined
There are no neighbours associated with this application.
Company Name Address
Conservation Officer Westgate Plaza One, Westgate, Barnsley, S70 2DR
Forestry Officer Level 1 Westgate Plaza One PO Box 604 Barnsley S70 9FE
Highway Drainage Westgate Plaza 1 PO Box 601 Barnsley S70 9FA
Highways DC Highways and Engineering Level 2 Westgate Plaza 1 PO Box 604 Barnsley S70 9FE
Urban Design Officer Level 1 Westgate Plaza 1 PO BOX 604 Barnsley
Yorkshire Water Services Limited Land Use Planning Western Way Halifax Road BRADFORD BD6 2LZ
Please note these documents are for viewing only. Attempting to save a copy or copies may infringe on copyright laws.
20210501 Adopted Highways.bmp ( 2.55 MB )
20210501 Albert Street East - Hostile Vehicle Mitigation Measures.pdf ( 0.54 MB )
20210501 Alhambra Bench type 1.pdf ( 0.46 MB )
20210501 Alhambra entrance - Indicative levels plan.pdf ( 0.2 MB )
20210501 Alhambra Feature foundations.pdf ( 3.16 MB )
20210501 Alhambra Typical Step details.pdf ( 0.59 MB )
20210501 Alhambra Wall type 1.pdf ( 1.09 MB )
20210501 ApplicationFormRedacted.pdf ( 1.55 MB )
20210501 Bench type 1 and step type 1.pdf ( 0.46 MB )
20210501 Cheapside General arrangement plan.pdf ( 0.59 MB )
20210501 Drainage 2.pdf ( 3.54 MB )
20210501 Drainage asset spec for Glassworks Public Realm - 00.18138 D.pdf ( 4.79 MB )
20210501 Drainage construction details 2.pdf ( 0.53 MB )
20210501 Drainage Construction Details 3.pdf ( 0.53 MB )
20210501 Drainage contruction details.pdf ( 0.53 MB )
20210501 Drainage Work.pdf ( 0.32 MB )
20210501 Drainage.pdf ( 2.66 MB )
20210501 Final covering letter phase 3.pdf ( 0.11 MB )
20210501 General arrangement plan.pdf ( 0.37 MB )
20210501 Glassworks Phase 2.pdf ( 0.14 MB )
20210501 Gully specification.pdf ( 0.67 MB )
20210501 Handbook.pdf ( 1.93 MB )
20210501 Heald Bollard Options.pdf ( 3.71 MB )
20210501 HT3-EM Matador 2020.pdf ( 1.98 MB )
20210501 Installed Matadors (pdf).pdf ( 4.63 MB )
20210501 Interchange Square option 1 - Hostile vehicle mitigation measures.pdf ( 0.76 MB )
20210501 Kerbs.pdf ( 0.14 MB )
20210501 Levels 2.pdf ( 0.24 MB )
20210501 Levels Cheapside.pdf ( 1.09 MB )
20210501 Levels Peel Square.pdf ( 0.64 MB )
20210501 Levels.pdf ( 0.24 MB )
20210501 Manual Matador 4 2020.pdf ( 3.04 MB )
20210501 Market Street - Hostile vehicle mitigation measures.pdf ( 0.42 MB )
20210501 Master landscape specification.pdf ( 0.48 MB )
20210501 Master landscape.pdf ( 0.48 MB )
20210501 Pall mall hostile vehical mitigation measures.pdf ( 0.69 MB )
20210501 Parking Plan.pdf ( 1.09 MB )
20210501 Peel Square - Hostile vehicle mitigation measures.pdf ( 1.53 MB )
20210501 Peel Square feature foundations 2.pdf ( 0.67 MB )
20210501 Peel Square Feature foundations.pdf ( 0.67 MB )
20210501 Peel Square General arrangement plan 2.pdf ( 0.88 MB )
20210501 Peel Square general arrangement plan 3.pdf ( 0.88 MB )
20210501 Peel Square general arrangement plan 4.pdf ( 0.88 MB )
20210501 Peel Square Highway boundary .jpg ( 0.3 MB )
20210501 Peel Square Levels plan.pdf ( 0.64 MB )
20210501 Peel Square Paving Swatches.pdf ( 0.36 MB )
20210501 Peel Square Planting Plan.pdf ( 0.45 MB )
20210501 Peel Square Typical step details 2.pdf ( 0.59 MB )
20210501 Peel Square Typical Step Details.pdf ( 0.59 MB )
20210501 Peel Square Typical street detail.pdf ( 0.59 MB )
20210501 Peel Square Typical Wall Details.pdf ( 0.45 MB )
20210501 Planning Phasing Plan.pdf ( 2.47 MB )
20210501 Planting plan.pdf ( 0.21 MB )
20210501 Proposed lighting 2.pdf ( 0.43 MB )
20210501 Proposed lighting.pdf ( 0.43 MB )
20210501 Scope of Works .pdf ( 0.24 MB )
20210501 Site Delivery Plan.pdf ( 9.29 MB )
20210501 Soft landscaping.pdf ( 0.2 MB )
20210501 Soft planting.pdf ( 0.26 MB )
20210501 Specification for drainage work.pdf ( 0.32 MB )
20210501 Surface finishes 2.pdf ( 0.92 MB )
20210501 Surface finishes.pdf ( 0.92 MB )
20210501 Town Centre Restrictions 1.pdf ( 3.47 MB )
20210501 Town Centre Restrictions 2.pdf ( 3.47 MB )
20210501 Town Centre Restrictions 3.pdf ( 0.53 MB )
20210501 Town Centre Restrictions.pdf ( 0.53 MB )
20210501 Typical tree pit detail in hard surfacing.pdf ( 0.59 MB )
20210501 Typical Tree Pit Detail.pdf ( 0.6 MB )
20210501 Vehicle tracking.pdf ( 1.16 MB )
20210501 Wall type.pdf ( 0.27 MB )
20210501 Whole existing site plan.pdf ( 3.77 MB )
Amended Documentation
20210499 - 0500 - 0501 - C14 - BGW2-ACE-XX-ZZ-DR-C-G700-0134-Access Road White Lining Details.pdf ( 0.54 MB )
20210499 - 0500 - 0501 - C14 - Lambra Road Highway Boundary and New Adoption Rev1.pdf ( 0.57 MB )
20210499 - 0500 - 0501 - C14 - Main Sqaure Highway Boundary and Stopping up Rev1.pdf ( 0.75 MB )
Plans
20210501 [2018-0279] - Planning Phasing Plan + Application Site Plan (Rev.1).pdf ( 1.57 MB )
Superseded Documentation
20210499 0500 +0501 Application Location Plan (07-05-2021).pdf ( 0.58 MB )